Check new Project

Execution of the sewage collection network in Taybad city – Phase 1 (Northern section)

Execution of approximately 55 kilometers of wastewater collection network with diameters of 200, 250, 300, and 400 millimeters, including pipe and equipment procurement, materials, asphalt removal, trench or tunnel excavation using traditional methods, installation of double-walled polyethylene sewer pipes, pipe bedding, and surplus soil transportation.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
When an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting.

Challenges

Services:

Wastewater collection system

Clients:

Sangan Steel Mining Industries Company (SSMIC)

Date:

27 August 2023

continues
Location:

Project Location

How We Solve This Project

Sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehen derit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident sunt.