Construction of the building, design, procurement, fabrication, transportation, installation, and commissioning of mechanical, electrical, control, and instrumentation equipment for the second module of the Sari wastewater treatment plant
Construction of a wastewater treatment plant with a capacity of 546 liters per second for a population of 105,800 people / MLE / Excavation: 1,000 cubic meters / Embankment: 5,452 cubic meters / Concrete pouring: 8,438 cubic meters / Rebar work: 892,644 kilograms / Formwork: 24,102 square meters
Challenges
- Nemo enim ipsam voluptatem quia voluptas.
- Accusamus et iusto odio dignissimos ducimus.
- Nam libero tempore, cum soluta nobis est eligend.
- Accusamus et iusto odio dignissimos ducimus.
Treatment plant
Mazandaran Water and Wastewater Company
August 03, 2013
Sari
How We Solve This Project
Sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehen derit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident sunt.




