Check new Project

Construction of the building, design, procurement, fabrication, transportation, installation, and commissioning of mechanical, electrical, control, and instrumentation equipment for the second module of the Sari wastewater treatment plant

Construction of a wastewater treatment plant with a capacity of 546 liters per second for a population of 105,800 people / MLE / Excavation: 1,000 cubic meters / Embankment: 5,452 cubic meters / Concrete pouring: 8,438 cubic meters / Rebar work: 892,644 kilograms / Formwork: 24,102 square meters

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
When an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting.

Challenges

Services:

Treatment plant

Clients:

Mazandaran Water and Wastewater Company

Date:

August 03, 2013

Location:

Sari

How We Solve This Project

Sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehen derit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident sunt.